OBOL launchpool on Gate
Gate · Ended
- Start
- End
- APR
- >1000%
- Pool rewards
- 2.25M OBOL
- Tracked since
- 7 May 2025
Times are in Kyiv time.
Partner link. Methodology
Available pools
| Stake | APR | Min. | Limit per user | Rewards | Staked |
|---|---|---|---|---|---|
| OBOL stake in the new coin | >1000% | 1 | 40,000 OBOL | 250,000 OBOL | 42.84M |
| GT | 26.5% | 0.01 | 1,000 GT | 800,000 OBOL | 7.97M |
| BTC | 18.5% | 0.000001 | 10 BTC | 1.20M OBOL | 8,689.62 |
Limits are in the stake coin. The pool's APR falls as the total stake grows.
About the project
Obol exists to distribute, decentralize, and democratize the digital infrastructure of the future — starting with Ethereum, and expanding to all of Web3. As the foundation for Layer 1 blockchains and decentralized infrastructure networks, the Obol Collective is home to the world’s largest decentralized operator ecosystem. Today, over 800 operators globally decentralized operators run Obol Distributed Validators (DVs) to secure more than $1B on mainnet. Obol DVs deliver better performance, fewer risks, and greater rewards than traditional validators — empowering anyone to run high-performance, slashing-resistant validators. Alongside DVs, the Obol Stack is a modular, plug-and-play framework that makes it easy to deploy and manage Ethereum nodes, AI agents, AVSs, and other decentralized infrastructure. From L1s and L2s to DePIN, AVSs, AI Agents, and beyond — Obol is powering the next generation of decentralized systems.
Other Gate pools
| Coin | Stake | Period | Status | APR |
|---|---|---|---|---|
| KOR | USDT, GT, KOR | 4 Nov – 4 Dec 2026 | Upcoming | >1000% |
| XAUT | USDT, GT, XAUT | 26 Oct – 16 Nov 2026 | Active | 6.5% |
| DNA | BTC, ETH, DNA | 16 Oct – 6 Nov 2026 | Active | 83.0% |
| BLKHION | USDT, BLKGRWON, BLKHION, MAG7XON | 6 Oct – 20 Oct 2026 | Ended | 154.8% |
| CT | USDT, CT, GT | 30 Sep – 21 Oct 2026 | Ended | 368.2% |
| GT | BTC, ETH | 30 Sep – 21 Oct 2026 | Ended | 6.5% |